15~18年和7~10年。 A dynamic planning model for single-unit pump variable speed optimal operation was developed in which peak-valley electricity prices and variable water levels in down-stream were considered. In this model, the minimum electricity consumption cost in one-day operation was the objective function. The speed of pump was a decision variable and specified pumping water volume was the constraint. A comparison between optimized variable speed and fixed speed operations of a single-unit in Jiangdu No. 4 Pumping Station was made. The results show that within the head amplitude and with full-load operation, regardless of considering peak-valley electricity prices, the benefits of variable speed operation was not enough to compensate for energy losses of the VFD and considering the peak-valley electricity prices and part-load operation, the benefit was excellent while without considering peak-valley electricity prices and single-unit operates at 80% and 60% loads, the saving 15 to 18 years and 7 to 10 years can compensate respectively for the VFD investments.
參考文獻
相似文獻
引證文獻
引用本文
程吉林,張禮華,張仁田,龔懿,朱紅耕,鄧東升.泵站單機組變速運行優(yōu)化方法研[J].農(nóng)業(yè)機械學報,2010,41(3):72-76. Methodology of Single-unit Variable Speed Operation in Pumping Station[J]. Transactions of the Chinese Society for Agricultural Machinery,2010,41(3):72-76.