ass日本风韵熟妇pics男人扒开女人屁屁桶到爽|扒开胸露出奶头亲吻视频|邻居少妇的诱惑|人人妻在线播放|日日摸夜夜摸狠狠摸婷婷|制服 丝袜 人妻|激情熟妇中文字幕|看黄色欧美特一级|日本av人妻系列|高潮对白av,丰满岳妇乱熟妇之荡,日本丰满熟妇乱又伦,日韩欧美一区二区三区在线

內(nèi)蒙古河套灌區(qū)節(jié)水工程改造效果分析與評(píng)估
CSTR:
作者:
作者單位:

作者簡(jiǎn)介:

通訊作者:

中圖分類(lèi)號(hào):

基金項(xiàng)目:

國(guó)家自然科學(xué)基金資助項(xiàng)目(51069006)和內(nèi)蒙古自治區(qū)水利廳資助項(xiàng)目(NMSH2012—01)


Analysis and Assessment of Water-saving Project of Hetao Irrigation District in Inner Mongolia
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 圖/表
  • |
  • 訪問(wèn)統(tǒng)計(jì)
  • |
  • 參考文獻(xiàn)
  • |
  • 相似文獻(xiàn)
  • |
  • 引證文獻(xiàn)
  • |
  • 資源附件
  • |
  • 文章評(píng)論
    摘要:

    以內(nèi)蒙古河套灌區(qū)1982—2012年長(zhǎng)系列農(nóng)業(yè)凈引水量和年降水量資料為基礎(chǔ),運(yùn)用均值分析,、方差分析,、相關(guān)分析、時(shí)間序列分析和生存分析等數(shù)理統(tǒng)計(jì)學(xué)方法,,并結(jié)合內(nèi)蒙古河套灌區(qū)農(nóng)業(yè)種植發(fā)展進(jìn)程,,分析了河套灌區(qū)多年農(nóng)業(yè)凈引水量變化趨勢(shì)與影響因素,得出年降水量(超過(guò)211.76mm時(shí),即豐水年)和節(jié)水工程改造分別獨(dú)立地與農(nóng)業(yè)凈引水量呈明顯負(fù)相關(guān)關(guān)系的結(jié)論,。運(yùn)用時(shí)間序列法預(yù)測(cè)了2013,、2014和2015年河套灌區(qū)的農(nóng)業(yè)凈引水量分別為44.5、44.18和43.86億m3,;同時(shí)運(yùn)用生存分析法預(yù)測(cè)了在灌區(qū)現(xiàn)有節(jié)水改造規(guī)模條件下,,河套灌區(qū)農(nóng)業(yè)凈引水量區(qū)間為35~55億m3,平均為45億m3,。

    Abstract:

    The net water diversion of agriculture in Hetao Irrigation District was studied. Based on the data during 1982 to 2012 in Hetao Irrigation District, the characteristics of the net water diversion variability in 31 years were analyzed by using several statistic methods, such as ANOM, ANOVA, correlation analysis, time series analysis and survival analysis. In addition, the impact of annual precipitations and water-saving engineering projects was analyzed by the progress of Hetao Irrigation District developmental history. The forecasted net water diversion in Hetao Irrigation District would be about 44.5×10.8m3 in 2013, 44.18×108m3 in 2014 and 43.86×108m3 in 2015 by the time series analysis method. In current water-saving engineering project, the forecasted net water diversion would be from 35×108m3 to 55×108m3 by the survival analysis method. The net water diversion was influenced sharply by annual precipitation (more than 211.76mm, namely wet years) and water-saving engineering project. These two factors had a negative correlation with the net water diversion. Finally, the relationship between net water diversion and total investment of water-saving engineering project was discussed. The results provided an important foundation for the management of sustainable development in Hetao Irrigation District.

    參考文獻(xiàn)
    相似文獻(xiàn)
    引證文獻(xiàn)
引用本文

屈忠義,楊曉,黃永江.內(nèi)蒙古河套灌區(qū)節(jié)水工程改造效果分析與評(píng)估[J].農(nóng)業(yè)機(jī)械學(xué)報(bào),2015,46(4):70-76,112. Qu Zhongyi, Yang Xiao, Huang Yongjiang. Analysis and Assessment of Water-saving Project of Hetao Irrigation District in Inner Mongolia[J]. Transactions of the Chinese Society for Agricultural Machinery,2015,46(4):70-76,112.

復(fù)制
分享
文章指標(biāo)
  • 點(diǎn)擊次數(shù):
  • 下載次數(shù):
  • HTML閱讀次數(shù):
  • 引用次數(shù):
歷史
  • 收稿日期:2014-04-30
  • 最后修改日期:
  • 錄用日期:
  • 在線發(fā)布日期: 2015-04-10
  • 出版日期: 2015-04-10
文章二維碼